508 Arrowtown-lake Hayes Road Arrowtown 9371
Queenstown Lakes · property 29203 · Sec 9 BLK VII Shotover SD - 6.171500 Ha CT- OT6A/996
Every consent eDocs lists on this property
| Consent | Description | Applicant | Status | Status date |
|---|---|---|---|---|
| RM261035 Resource | To Provide Telecommunications Reticulation To All Allotments In A New Subdivision S127 To Change Conditions Of Rm241057 To Enable Wireless Telecommunication And Ensure That Wireless Structures Are Located Within The Domestic Curtilage Area At 508 Arrowtownlake Hayes Road, Arrowtown | A Feeley, E Borrie And Lp Trustees Limited | Decision Issued | 3 Nov 2026 |
| RM260881 Resource | Variation To Rm241057 And Land Use For The Construction Of A Residential Unit, Residential Flat, Swimming Pool And Tennis Court Partially Outside A Future Building Platform And With A Chimney Breaching Maximum Building Height In Future Lot 1 At 508 Arrowtown-Lake Hayes Road, Arrowtown | Walker Family Trust | Decision Issued | 16 Sep 2026 |
| RM241057 Resource | To Subdivide A 6.2 Ha Parcel Of Land Into Six Residential Lots, In Up To Three Stages At 508 Arrowtown-Lake Hayes Road, Queenstown | A J Feeley & E E Borrie And Lp Trustees Limited | Decision Issued | 23 Jul 2025 |
| MN241057 | A J Feeley & E E Borrie And Lp Trustees Limited - To Subdivide A 6.2 Ha Parcel Of Land Into Six Residential Lots, In Up To Three Stages At 508 Arrowtown-Lake Hayes Road, Queenstown | Awaiting Officer Review | ||
| EA241057 | 175 East Limited - Engineering Acceptance In Relation To Subdivide A 6.2 Ha Parcel Of Land Into Six Residential Lots, In Up To Three Stages At 508 Arrowtown-Lake Hayes Road, Queenstown | Being Vetted | ||
| BC150347 Building | Remove And Replace Woodburner | Lapsed | 14 Apr 2015 |
Consent numbers link to the consent's documents in QLDC eDocs, which needs an eDocs sign-in.
From the documents of RM261035 read 18 Nov 2026
- Lodged by
- Not named on the application form
- Timber cladding
- Not mentioned in the documents read
- Not read
- no application form (Form 9); no AEE; no plans
From the documents of RM260881 read 19 Nov 2026
- Lodged by
- Morgan Shepherd (Brown & Company Planning Group)
morgan@brownandcompany.co.nz
03 409 2258 - Applicant
- Walker Family Trust
michael@toddwalker.com
021 418 6476
As written on the application form. Don't add applicants to email marketing lists: that needs their consent. - Timber cladding
-
- Walls Timber weatherboard (horizontal and vertical) Stained Schist Natural
- Timber weatherboard (horizontal and vertical) Stained As shown in Figure 5 above, 15.8m² of the garage will be located outside of the building platform.
- VERTICAL TIMBER CLADDING NATURAL FINISH OR LIGHT STAIN
- HORIZONTAL TIMBER CLADDING NATURAL FINISH OR LIGHT STAIN
A. AEE (NO WATERMARK) (PDF, 1.6MB)G. Affected Party Approval Plans (PDF, 25.6MB)
Lines of the assessment, plans or specification that mention timber cladding. Some describe what the neighbourhood rules allow rather than what is proposed.