1 sites
Leonard's report

Queenstown Lakes: I last read eDocs 19 Nov 2026, 2:32am: 0 new consents, 526 re-checked. I've read the documents of 2269 building-work consents. Values come from the building consent application, so a site has one only once I've read it.

Thames-Coromandel: I last read the council's consent tracker 19 Nov 2026, 12:02pm: 0 new consents. That read stopped early: ABA lodged 1 Jan 2025 to 19 Nov 2026, page 1: Get "https://trackconsents.tcdc.govt.nz/api/consentlookup/daterange/ABA/20250101/20261119/1/0": EOF The tracker gives each consent's value, owner and agent; I read the application form, plans and specifications as for Queenstown Lakes.

Auckland: I last read the council's map layer 19 Nov 2026, 10:27am: 3138 new consents, 23 left out with no address on their land. It has only building consents issued in the last two years for work over $1m, and names no builder or designer.

One card per property, placed by the resource and building consents on it from this year and last. Cards have a clay edge when timber cladding is mentioned: in Queenstown Lakes' and Thames-Coromandel's documents, or in an Auckland consent's description.

The issued filter goes by a building consent's issue date (for Queenstown Lakes, the date of the issued consent in eDocs) or a resource consent's decision date.

1 sites Names are as written on the application forms. Shorten the name to catch other spellings of it. All builders

Resource consent in progress

0

Design still moving

None

Resource consent decided

0

Approved, and no building consent yet

None

Building consent lodged

0

Spec mostly fixed; not yet issued

None

Building consent issued

1

Building can start

156 Dalefield Road Dalefield 9371 Queenstown Lakes

Renovation Of Existing Consented Garage Loft Space To Create New Studio Flat With Own Entrance And Ground Floor Laundry

Builder
Compound Group Ltd - Josh Atkins
Designer
Anna-Marie Chin Architects Ltd - Kathryn Nevatt
Lodged by
Sam Johnston - Town Planning Group

Timber Exterior surfaces will comprise blended schist veneer, vertical cedar weatherboards stained in Dryden’s Wood Oil “Driftwood” or similar, and Colorsteel corrugate roofing and 29 more

  • Resource RM261070 Decision Issued · 13 Nov 2026 G & C Barbara
  • Building BC260680 Building Consent Issued · 30 Jun 2026
  • Resource RM260231 Decision Issued · 12 May 2026 G & C Barbara
and 3 more on this property

Finished or closed

0

Built, withdrawn or cancelled

None