← Board

156 Dalefield Road Dalefield 9371

Queenstown Lakes · property 18480 · Lot 2 DP 315607 - 0.966400 Ha CT- 61291

Every consent eDocs lists on this property

Consent Description Applicant Status Status date
RM261070 Resource Land Use Consent To Construct Residential Buildings Within And Outside Of A Registered Building Platform, With Associated Earthworks; A Section 127 Change Of Conditions To Rm260231; & A Section 221 Variation Of Consent Notice Conditions At 156 Dalefield Road, Dalefield G & C Barbara Decision Issued 13 Nov 2026
RM260231 Resource Land Use Consent To Establish A Residential Unit Outside Of A Building Platform With Associated Earthworks, Establish Temporary Buildings; And Undertake A S221 To Amend Consent Notice Conditions At 156 Dalefield Road, Queenstown G & C Barbara Decision Issued 12 May 2026
OB260231 G & C Barbara - Objection To Fees - Land Use Consent To Establish A Residential Unit Outside Of A Building Platform With Associated Earthworks, Establish Temporary Buildings; And Undertake A S221 To Amend Consent Notice Conditions At 156 Dalefield Road, Queenstown Dismissed
MN260231 G & C Barbara - Land Use Consent To Establish A Residential Unit Outside Of A Building Platform With Associated Earthworks, Establish Temporary Buildings; And Undertake A S221 To Amend Consent Notice Conditions At 156 Dalefield Road, Queenstown Awaiting Non Compliance Information
BC261387 Building Stage 1 Of 2 - Construction Of Foundations Comprising Of Icf Foundation Wallks & Ribraft Slab On Grade. Existing Relocated House Will Be Lowered Onto New Foundations Building Consent Issued 4 Nov 2026
BC260680 Building Renovation Of Existing Consented Garage Loft Space To Create New Studio Flat With Own Entrance And Ground Floor Laundry Building Consent Issued 30 Jun 2026

Consent numbers link to the consent's documents in QLDC eDocs, which needs an eDocs sign-in.

From the documents of RM261070 read 18 Nov 2026

Lodged by
Sam Johnston - Town Planning Group
sam@townplanning.co.nz
0210573762
Applicant
G & C Barbara
glenbournefarmltd@gmail.com
027 256 5959
As written on the application form. Don't add applicants to email marketing lists: that needs their consent.
Timber cladding
  • Exterior surfaces will comprise blended schist veneer, vertical cedar weatherboards stained in Dryden’s Wood Oil “Driftwood” or similar, and Colorsteel corrugate roofing
  • The proposed materials are vertical cedar weatherboards, schist, and Colorsteel corrugate roofing and cladding in “Flaxpod” with a light reflectance value of 7%. These
  • CEDAR VERTICAL WEATHERBOARDS (2) COLORSTEEL CORRUGATE ROOFING (3)

AEE - FINAL FINAL (PDF, 1.3MB)Attachment [E] Architectural Plans (PDF, 8.9MB)

Lines of the assessment, plans or specification that mention timber cladding. Some describe what the neighbourhood rules allow rather than what is proposed.

From the documents of RM260231 read 19 Nov 2026

Lodged by
Georgie Hadfield - Town Planning Group
georgie@townplanning.co.nz
+64 27 280 8248
Applicant
G & C Barbara
glenbournefarmltd@gmail.com
027 256 5959
As written on the application form. Don't add applicants to email marketing lists: that needs their consent.
Timber cladding
  • Plan Details with Cedar - Main House Ensuite Addition - Roof Details
  • Window Details in Cedar Outdoor Living Perspectives
  • Window Details in Cedar Flat Roof Parapet Details
  • WE.02 Vertical Shiplap over 90mm Timber Framing - Vertical Shiplap Weatherboard (finish: Dryden
  • WE.05 Vertical Shiplap over 140mm Timber Framing - Vertical Shiplap Weatherboard (finish: Dryden
  • WE.09 Vertical Shiplap over 90mm Timber Framing - Vertical Shiplap Weatherboard (finish: Dryden
  • Vertical Shiplap profile boards to have 110mm cover TBC by Owner.
  • Vertical shiplap cedar weatherboard with Dryden WoodOil
  • Shiplap weatherboard cladding on cavity
  • WE.11 Vertical Shiplap over 140mm Timber Framing - Vertical Shiplap cedar cladding, over
  • Vertical Shiplap over 90mm Timber Framing
  • 1 Corrugate to Cedar Internal Corner A203
  • Plan Details with Cedar - Main House
  • Cedar external corner mould Vertical timber cavity batten
  • Cedar trim to suit on site Damp-proof course
  • Vertical Shiplap over 90mm Timber Framing - New
  • Vertical Shiplap over 140mm Timber Framing
  • WE.09 Vertical Shiplap over 90mm Timber Framing - New
  • - Vertical Shiplap Weatherboard (finish: Dryden WoodOil, colour: Dryhills or similar), over
  • 2 External Corner and Window Jamb - Cedar A204
  • 4 Internal Corner and Window Jamb - Cedar A204
  • Cedar barge board, cut to suit. Colour to match
  • 1 Window Head - Cedar A412
  • 2 Window Sill - Cedar A412
  • 3 Wall Base - Cedar A412
  • Small Pipe Penetration - Vertical Shiplap Weatherboard 4 -
  • Extract Fan Penetration - Vertical Shiplap Weatherboard Do not scale off print - refer to figured dimensions.

Plans - Existing Residential Unit 575 Speargrass Flat Road (PDF, 6.5MB)

Lines of the assessment, plans or specification that mention timber cladding. Some describe what the neighbourhood rules allow rather than what is proposed.

From the documents of BC260680 read 19 Nov 2026

Designer
Anna-Marie Chin Architects Ltd - Kathryn Nevatt
kathryn@amchinarchitects.co.nz
03 409 8881
Engineer
Engco (The Engineering Company Ltd) - Tim Niven
tim@engco.co.nz
03 442 4255
Builder
Compound Group Ltd - Josh Atkins
josh@compound.co.nz
021 277 8755
Lodged by
Anna-Marie Chin Architects (Architect)
kathryn@amchinarchitects.co.nz
02 409 8881
Applicant
Owner
glenbournefarmltd@gmail.com
027 2565959
As written on the application form. Don't add applicants to email marketing lists: that needs their consent.
Timber cladding
Not mentioned in the documents read