← Board

1 Ray Emery Drive Auckland Airport 2022

Auckland

Consents on this land from Auckland Council's map layer

Consent Description Applicant Status Status date Value
BCO10417969 Building Base build works and associated base build fire engineering design of the Air NZ Elite Lounge (International Terminal Building) - Air NZ Elite Lounge Base build works in preparation and support of sep Issued 1 Oct 2026 $1.4m
BCO10413390 Building TH01 Transport Hub building at Auckland International Airport - Internal fit out of airline office tenancies within Levels 1 and 2, including partitions, doors, ceilings, finishes, joinery, mechanical Issued 12 Jun 2026 $2.8m
BCO10409566 Building ITB - Western Bag Hall (WBH) - Fit out of the back of house ground handler accommodation spaces adjacent within the footprint of the existing baggage hall area. This area will be delivered in two stag Issued 22 Apr 2026 $6m
BCO10408549 Building ITB Airside Level 1 - Refurbishment of the current airport Arrivals duty-free area, proposed works include a new exit to customs check, a shop area, install wall bays, joinery, flooring, HVAC upgrade Issued 25 Feb 2026 $3m
BCO10407831-2 Building ITB - Stage 2 of 2 - Architectural fit out works for the Level 1 Emigration Hall at Auckland Airport, including international and do mestic screening areas, roof and interior layout changes as part of Issued 19 May 2026 $7.5m
BCO10407831-1 Building ITB - Stage 1 of 10 stages - Internal floor layout changes. Avsec and Customs functions to be flipped over works over 10 phases. New ceilings, flooring and partitions for back of house functions, fire Issued 10 Mar 2026 $10m
BCO10401774-6 Building ITB - WP3 - Stage 6 of 6 stages - Construction of fit-out and vertical transportation works, including installation of check-in systems (Automatic Bag Drops and Self-Service Kiosks), architectural fit Issued 28 Aug 2026 $120m
BCO10401774-4 Building ITB - WP3 - Stage 4 of 6 - Construction of superstructure works including the Typical Concourse Pushout, VT Pushout and entrance por tals, plus alterations to existing terminal structures. Works inclu Issued 1 May 2026 $27.8m
BCO10401774-3 Building WP3 Stage 3 of 6 - Fit out of check-in Zone C at Auckland International Terminal Building. Works comprise removing existing check-in desks, renewal of back wall of check-in, install of Auto Bag Drops, Issued 3 Feb 2026 $5m
BCO10390586-2 Building AIAL - ITB - Headhouse - Stage 2 of 2 of this consent covers the fit out, services, architecture and fire systems for the Headhouse Baggage Hall of the Domestic Processor. This is the Baggage Hall bas Issued 23 Jan 2026 $49.8m
BCO10404208 Building Auckland Airport International Terminal Building (ITB), Level 1 Airside Departures Walkthrough area -Refurbishment of the current airport departures duty free walkthrough area, proposed works include Issued 4 Dec 2025 $5m
BCO10402989 Building AIAL - ITB - Level 1, Airside, Jean Batten International Terminal - Duty Free Base Build Reconfiguration. The proposed works involve reallocation of floor space between airside and landside in the dut Issued 3 Nov 2025 $3m
BCO10401960 Building Temporary Satellite Check-In building. Construction of a proprietary portal frame building and associated site works to adjacent connections - foundations, structure and fit-out. New single-level tran Issued 31 Oct 2025 $6.2m
BCO10401774-2 Building AIAL ITB WP3 Stage 2 of 6 stages - Demolition of front-of-house areas including existing amenities, facade and fire egress bridge, c onstruction of new substructure including piling and vertical trans Issued 11 Dec 2025 $22.7m
BCO10401774-1 Building AIAL ITB WP3 Stage 1 of 3 - Works include a reconfiguration of the existing Back of House spaces, make good works and some areas of full fit-out. The BOH works does not seek to systemically change the Issued 7 Oct 2025 $41m
BCO10393855 Building Auckland Airport Domestic Terminal - This consent covers the Envelope for the Headhouse, Pier and Fixed-Linked Bridges (FLBs) of the Auckland Domestic Processor and is in line with the consent strateg Issued 30 Apr 2025 $1300.8m
BCO10392381 Building AIAL -ITB - DP - Landside Structures: Waste Facility, Checkpoint Charlie, Checkpoint Charlie Guardhouse, Fire Tank Slab, Sprinkler Valve Room and Eastern Forecourt Canopies (located approximately betw Issued 6 May 2025 $2.5m
BCO10391731 Building AIAL - International Terminal Building - Level 1 - Demolition of an existing pedestrian overbridge, reinstatement and strengthening of the remaining portal. Issued 19 Feb 2025 $2m
BCO10390586-1 Building AIAL - ITB - Headhouse, Pier, and FLBs of the Domestic Processor - Stage 1 of 2 - Stage 1 of this consent covers the fit out, services, architecture, and fire systems. Refer to the cover letter for d Issued 2 Sep 2025 $352.2m
BCO10389705 Building AIAL - ITB Level 2 - Qantas Lounge. The expansion and refurbishment of the Qantas Lounge facilities. Include Base Build services upgrade and extensions to service the new lounge facility Issued 10 Feb 2025 $4m
BCO10388972 Building DP Domestic Processor - Pier and FLB's. This consent covers the balance of structures, including the envelope supporting structure, fit-out structures, and vertical transport structural elements, as p Issued 22 Nov 2024 $12.3m
BCO10388799 Building Bldg. 1 - AIAL International Terminal - Demolish and refurbish the existing lounge as well as the expansion space and reopen this space as the new Qantas Premium Lounge at Auckland Airport. Amendment Issued 26 Nov 2024 $15m

Auckland's layer gives each consent's description, value and issue date, but no applicant, builder or designer, and the council has no public page for a consent. The address is the one on the consent's land; land with several gives its first whole street address.