| Consent | Description | Applicant | Status | Status date | Value |
|---|---|---|---|---|---|
| BCO10417969 Building | Base build works and associated base build fire engineering design of the Air NZ Elite Lounge (International Terminal Building) - Air NZ Elite Lounge Base build works in preparation and support of sep | Issued | 1 Oct 2026 | $1.4m | |
| BCO10413390 Building | TH01 Transport Hub building at Auckland International Airport - Internal fit out of airline office tenancies within Levels 1 and 2, including partitions, doors, ceilings, finishes, joinery, mechanical | Issued | 12 Jun 2026 | $2.8m | |
| BCO10409566 Building | ITB - Western Bag Hall (WBH) - Fit out of the back of house ground handler accommodation spaces adjacent within the footprint of the existing baggage hall area. This area will be delivered in two stag | Issued | 22 Apr 2026 | $6m | |
| BCO10408549 Building | ITB Airside Level 1 - Refurbishment of the current airport Arrivals duty-free area, proposed works include a new exit to customs check, a shop area, install wall bays, joinery, flooring, HVAC upgrade | Issued | 25 Feb 2026 | $3m | |
| BCO10407831-2 Building | ITB - Stage 2 of 2 - Architectural fit out works for the Level 1 Emigration Hall at Auckland Airport, including international and do mestic screening areas, roof and interior layout changes as part of | Issued | 19 May 2026 | $7.5m | |
| BCO10407831-1 Building | ITB - Stage 1 of 10 stages - Internal floor layout changes. Avsec and Customs functions to be flipped over works over 10 phases. New ceilings, flooring and partitions for back of house functions, fire | Issued | 10 Mar 2026 | $10m | |
| BCO10401774-6 Building | ITB - WP3 - Stage 6 of 6 stages - Construction of fit-out and vertical transportation works, including installation of check-in systems (Automatic Bag Drops and Self-Service Kiosks), architectural fit | Issued | 28 Aug 2026 | $120m | |
| BCO10401774-4 Building | ITB - WP3 - Stage 4 of 6 - Construction of superstructure works including the Typical Concourse Pushout, VT Pushout and entrance por tals, plus alterations to existing terminal structures. Works inclu | Issued | 1 May 2026 | $27.8m | |
| BCO10401774-3 Building | WP3 Stage 3 of 6 - Fit out of check-in Zone C at Auckland International Terminal Building. Works comprise removing existing check-in desks, renewal of back wall of check-in, install of Auto Bag Drops, | Issued | 3 Feb 2026 | $5m | |
| BCO10390586-2 Building | AIAL - ITB - Headhouse - Stage 2 of 2 of this consent covers the fit out, services, architecture and fire systems for the Headhouse Baggage Hall of the Domestic Processor. This is the Baggage Hall bas | Issued | 23 Jan 2026 | $49.8m | |
| BCO10404208 Building | Auckland Airport International Terminal Building (ITB), Level 1 Airside Departures Walkthrough area -Refurbishment of the current airport departures duty free walkthrough area, proposed works include | Issued | 4 Dec 2025 | $5m | |
| BCO10402989 Building | AIAL - ITB - Level 1, Airside, Jean Batten International Terminal - Duty Free Base Build Reconfiguration. The proposed works involve reallocation of floor space between airside and landside in the dut | Issued | 3 Nov 2025 | $3m | |
| BCO10401960 Building | Temporary Satellite Check-In building. Construction of a proprietary portal frame building and associated site works to adjacent connections - foundations, structure and fit-out. New single-level tran | Issued | 31 Oct 2025 | $6.2m | |
| BCO10401774-2 Building | AIAL ITB WP3 Stage 2 of 6 stages - Demolition of front-of-house areas including existing amenities, facade and fire egress bridge, c onstruction of new substructure including piling and vertical trans | Issued | 11 Dec 2025 | $22.7m | |
| BCO10401774-1 Building | AIAL ITB WP3 Stage 1 of 3 - Works include a reconfiguration of the existing Back of House spaces, make good works and some areas of full fit-out. The BOH works does not seek to systemically change the | Issued | 7 Oct 2025 | $41m | |
| BCO10393855 Building | Auckland Airport Domestic Terminal - This consent covers the Envelope for the Headhouse, Pier and Fixed-Linked Bridges (FLBs) of the Auckland Domestic Processor and is in line with the consent strateg | Issued | 30 Apr 2025 | $1300.8m | |
| BCO10392381 Building | AIAL -ITB - DP - Landside Structures: Waste Facility, Checkpoint Charlie, Checkpoint Charlie Guardhouse, Fire Tank Slab, Sprinkler Valve Room and Eastern Forecourt Canopies (located approximately betw | Issued | 6 May 2025 | $2.5m | |
| BCO10391731 Building | AIAL - International Terminal Building - Level 1 - Demolition of an existing pedestrian overbridge, reinstatement and strengthening of the remaining portal. | Issued | 19 Feb 2025 | $2m | |
| BCO10390586-1 Building | AIAL - ITB - Headhouse, Pier, and FLBs of the Domestic Processor - Stage 1 of 2 - Stage 1 of this consent covers the fit out, services, architecture, and fire systems. Refer to the cover letter for d | Issued | 2 Sep 2025 | $352.2m | |
| BCO10389705 Building | AIAL - ITB Level 2 - Qantas Lounge. The expansion and refurbishment of the Qantas Lounge facilities. Include Base Build services upgrade and extensions to service the new lounge facility | Issued | 10 Feb 2025 | $4m | |
| BCO10388972 Building | DP Domestic Processor - Pier and FLB's. This consent covers the balance of structures, including the envelope supporting structure, fit-out structures, and vertical transport structural elements, as p | Issued | 22 Nov 2024 | $12.3m | |
| BCO10388799 Building | Bldg. 1 - AIAL International Terminal - Demolish and refurbish the existing lounge as well as the expansion space and reopen this space as the new Qantas Premium Lounge at Auckland Airport. Amendment | Issued | 26 Nov 2024 | $15m |
Auckland's layer gives each consent's description, value and issue date, but no applicant, builder or designer, and the council has no public page for a consent. The address is the one on the consent's land; land with several gives its first whole street address.