49 Elysium Way Speargrass Flat 9371
Queenstown Lakes · property 24788 · Lot 100 DP 310210 (S/A) - Titles=> 291206, 291207, 291208, 291209, 291210, 291211, 291212, 291213, 291214, 293056, 293057, 40226, 40227, 40228, 40229
Every consent eDocs lists on this property
| Consent | Description | Applicant | Status | Status date |
|---|---|---|---|---|
| RM260710 Resource | Construction Of An Accessory Building And For Part Of The Residential Unit And Accessory Building To Be Outside The Building Platform; Associated Variations Under S127 To Rm181368 And Consent Notice 7949661.8 At 49 Elysium Way Rd 1, Queenstown | Njf & Ak Johnston No 1 Trust | Decision Issued | 23 Jul 2026 |
| RM200197 Resource | Application Under Section 88 Of The Resource Management Act 1991 (Rma) For Land Use Consent To Carry Out 4498M3 Of Earthworks To Complete The Construction Of A Building Platform And Lawn With Associated Landscaping At Lot 3 Elysium Way, Queenstown | A, N & T Johnston | Decision Issued | 16 Nov 2020 |
| MN200197 | A, N & T Johnston - Application Under Section 88 Of The Resource Management Act 1991 (Rma) For Land Use Consent To Carry Out 4498M3 Of Earthworks To Complete The Construction Of A Building Platform And Lawn With Associated Landscaping At Lot 3 Elysium Way, Queenstown | Complies | ||
| BC201145 Building | Construction Of Single Storey Dwelling With Loft | CCC Issued | 9 Jun 2026 | |
| SS181368 | Signing & Sealing - Consent Notice Variation - Ak & Nj & Taq Johnson - Land Use Consent To Construct A Residential Unit That Breaches Height, With Associated Earthworks, Services, Access And Landscaping, Vary A Consent Notice To Amend The Location Of A Building Platform At Lot 3 Elysium Way, Wakatipu Basin | Completed | ||
| RM181368 Resource | Land Use Consent To Construct A Residential Unit That Breaches Height, With Associated Earthworks, Services, Access And Landscaping, Vary A Consent Notice To Amend The Location Of A Building Platform At Lot 3 Elysium Way, Wakatipu Basin | Ak & Nj & Taq Featherston Johnson | Decision Issued | 28 Jan 2019 |
| MN181368 | Ak & Nj & Taq Featherston Johnson - Land Use Consent To Construct A Residential Unit That Breaches Height, With Associated Earthworks, Services, Access And Landscaping, Vary A Consent Notice To Amend The Location Of A Building Platform At Lot 3 Elysium Way, Wakatipu Basin | Awaiting Monitoring Inspection | ||
| ET181368 | Ak, Njf & Taqf Johnston - Extension Of Time - Extension Of Time To Rm181368 Of Two (2) Years To Complete Development At 49 Elysium Way, Queenstown | Decision Issued | 20 Nov 2023 |
Consent numbers link to the consent's documents in QLDC eDocs, which needs an eDocs sign-in.
From the documents of RM260710 read 19 Nov 2026
- Lodged by
- Alex Dunn - Southern Planning Group
alex@southernplanning.co.nz
027 840 2855 - Applicant
- Njf & Ak Johnston No 1 Trust
jjohnston@milfordasset.com
021 225 7355
As written on the application form. Don't add applicants to email marketing lists: that needs their consent. - Timber cladding
-
- Cedar ceiling sarking to match existing over, 156 rondo direct fix clip to specified furring channel (Aqualine for wet areas)
- Horizontal cedar weather board to match existing 20x45mm h3.2 cavity battens with
- Cladding CS01 Horizontal cedar weather board to match existing 20x45mm h3.2 cavity
- door with horizontal cedar weather board to match existing to suit existing
- horizontal cedar weather board to match existing to suit existing
Appendix [C] - Plans (PDF, 10.8MB)
Lines of the assessment, plans or specification that mention timber cladding. Some describe what the neighbourhood rules allow rather than what is proposed.