BC261532 Building Construction Of Single Storey Dwelling Application Complete

Consent numbers link to the consent's documents in QLDC eDocs, which needs an eDocs sign-in.

From the documents of BC261532 read 18 Nov 2026

Lodged by
Not named on the application form
pete@openarchitecture.nz
0273 077 317
Applicant
Owner
david259@gmail.com
021 2968 219
As written on the application form. Don't add applicants to email marketing lists: that needs their consent.
Timber cladding
  • Timber weatherboard cladding over 20mm drained cavity over
  • James Hardie Stria Weatherboard cladding over 20mm drained cavity
  • 18mm Timber shiplap weatherboards
  • 18mm Timber shiplap weatherboards Timber scriber beyond
  • TIMBER CLADDING Head - 5/A510
  • Timber Weatherboard Cladding..........................................................................................61 External Window & Door Joinery ............................................................................................64
  • 3617:1979(NZS) Specification for profiles of weatherboards, fascia boards, and flooring
  • 2.12 Timber Weatherboard Cladding 2.12.1 Scope
  • Supply and install the selected Timber Weatherboard Cladding type(s) to the locations shown on the drawings, complete with all accessories. All aspects of this work shall be carried out to comply with
  • The following is a list and a general description of the extent of Timber Weatherboard Cladding work, which are more specifically defined in the contract documents, required for the completion of the
  • 2.12.2 Vertical Weatherboard Profile Vertical Shiplap Weatherboard: ex.150mm x 25mm, machined to NZS 3617 and/or BRANZ Bulletin
  • Co-ordinate with other trades to ensure that the weatherboards correctly allow for door and window installation, and for the locations of pipes, outlets, and fittings installed by others.
  • Vertical Weatherboards Cavity-Fixed on Timber Framing - check all aspects of preparatory works, including, but not limited to:
  • correctly in place, and has a maximum moisture content of 20% at the time of weatherboard cladding installation.
  • and appropriate for the weatherboard cladding installation. - For cavity construction without a rigid wall underlay and where the studs are at greater than
  • works have been completed that will enable the weatherboards to be installed, and that the work of other trades does not negatively impact on or reduce the minimum clearances required by the NZ
  • 2.12.5.1 Vertical Shiplap Weatherboard - Cavity Fix Back flash all internal and external corners as detailed.
  • Carefully set-out Vertical Shiplap Weatherboard cladding vertically over the fluted/castelated horizontal cavity battens, to straight plumb lines, and fix to the framing with side laps directed away
  • bottom plate or floor structure. Install full length weatherboards boards where possible. Where joints are unavoidable, scarf the weatherboards at 45º and fix to solid framing through the top
  • Check for and eliminate any creep and/or spread of shiplap weatherboards during installation. Finish Standard Vertical Weatherboards, weatherboard trim, flashings and accessories at internal and
  • Upon delivery to site, inspect weatherboards and accessories and reject any items found to be damaged, defective or substandard. Contact the manufacturer/supplier for replacement.
  • Store weatherboards, flashings and accessories undercover, flat and true, clear of the ground by at least 150mm and supported on dry, clean timber bearers at maximum 900mm centres, or as
  • recommended by the weatherboard manufacturer. Keep stored materials and accessories dry and protected from damage and contamination at all times, and free from bending, distortion or excessive
  • Do not use damaged or defective weatherboards or accessories. Dock any oversized knots, unacceptable grade characteristics or damaged areas of weatherboard.
  • Weatherboards must be dry prior to installation. Do not install weatherboards during periods of wet weather. Seal all cut ends and fresh-cut timber with two coats of the selected exterior primer or
  • Handle weatherboards in accordance with the manufacturer's recommendations and in a manner that prevents damage to or deterioration of the material, including surface marking.
  • extreme care to keep absorbent materials (e.g. cedar, sawn framing, decking, paving) completely clean during all adjacent painting work. Correction of any such disfigurement shall be to the
  • Figure 19: Sloping soffit and cavity fixed weatherboard cladding Wall framing
  • Linea™ Weatherboard Purpose made flashing to
  • 009* BRANZ E2 Weathertightness Opinion for the Appraisal of Linea Oblique Weatherboard (Vertical) Cavity Cladding
  • 022* Façade Lab Ltd Testing of James Hardie Linea – Weatherboard on RAB Board in accordance with E2/VM2 (BRANZ – EM7)
  • 023* Façade Lab Ltd Testing of James Hardie Linea Oblique vertical weatherboard on rigid wall underlay to E2/VM2 (BRANZ EM7) using tests from
  • 024* BRANZ BRANZ Assessment – Face Load Strength of James Hardie Linea Weatherboard Clad Walls and Variations of Sheet thickness and
  • 025* BRANZ Durability Opinion on the Linea Weatherboard System DA 0220 dated 24/09/2017
  • 026* BRANZ Face Loading Testing of Low-Density Thick Weatherboard Report ST483 dated 20 February 2001

Plans (PDF, 6.9MB)Project Specification (PDF, 27.7MB)