← Board

144j Arrowtown-lake Hayes Road Lake Hayes 9371

Queenstown Lakes · property 15887 · Lot 13 DP 301727 (S/A) - Titles=> 585282, 7094, 7095, 7096, 7097, 7098, 7099, 7101, 7102, 7103, 7104, 7105

Every consent eDocs lists on this property

Consent Description Applicant Status Status date
RM260967 Resource To Construct An Accessory Building Within Setback On Approved Building Platform And A Section 127 To Amend The Building Design Approved Under Rm240537 As Varied By Rm250118 At 144J Arrowtown-Lake Hayes Road, Rd 1, Queenstown K Moynihan Decision Issued 8 Oct 2026
BC261539 Building Cancelled Construct New Twostorey Dwelling, Including Associated Services And Landscaping. Cancelled
RM250118 Resource Change Condition 1.0 Of Rm240537 To Change The Stamped Plans To Accommodate The Proposed Additions And Alterations; And To Change Consent Notice 5069118.6, As It Relates To Lot 5 Deposited Plan 301727, To Allow For The Construction Of A Building Outside Of The Approved Building Platform At 144J Arrowtown-Lake Hayes Road, Queenstown K Moynihan Decision Issued 27 Mar 2025
MN250118 K Moynihan - Change Condition 1.0 Of Rm240537 To Change The Stamped Plans To Accommodate The Proposed Additions And Alterations; And To Change Consent Notice 5069118.6, As It Relates To Lot 5 Deposited Plan 301727, To Allow For The Construction Of A Building Outside Of The Approved Building Platform At 144J Arrowtown-Lake Hayes Road, Queenstown Awaiting Officer Review
DB250444 Construction Of Two Storey Detached Dwelling And Garage Development Contribution Notice Sent
BC250444 Building Construction Of Two Storey Detached Dwelling And Garage Work Start Extension 16 Jun 2025
RM240537 Resource To Construct A Residential Unit And Residential Flat Which Extend Partially Outside Of An Approved Building Platform, With Associated Breaches Relating To Building Coverage, Boundary Setbacks, Maximum Building Height And Earthworks At 144J Arrowtown-Lake Hayes Road, Queenstown K Moynihan Decision Issued 11 Sep 2024
MN240537 K Moynihan - To Construct A Residential Unit And Residential Flat Which Extend Partially Outside Of An Approved Building Platform, With Associated Breaches Relating To Building Coverage, Boundary Setbacks, Maximum Building Height And Earthworks At 144J Arrowtown-Lake Hayes Road, Queenstown Awaiting Monitoring Inspection

Consent numbers link to the consent's documents in QLDC eDocs, which needs an eDocs sign-in.

From the documents of RM260967 read 19 Nov 2026

Lodged by
Alex Dunn - Southern Planning Group
alex@southernplanning.co.nz
0278402855
Applicant
K Moynihan
moynihank.1@gmail.com
As written on the application form. Don't add applicants to email marketing lists: that needs their consent.
Timber cladding
  • Wall Timber Cedar or hardwood timber stained in range

AEE (PDF, 0.6MB)

Lines of the assessment, plans or specification that mention timber cladding. Some describe what the neighbourhood rules allow rather than what is proposed.

From the documents of RM250118 read 19 Nov 2026

Lodged by
Not named on the application form
Timber cladding
Not mentioned in the documents read
Not read
no application form (Form 9)

From the documents of BC250444 read 18 Nov 2026

Value of work
$5.5m estimated on the application form, GST included
Designer
Mason and Wales Architects
architects@masonandwales.com
03 477 1096
Engineer
Batchelar McDougall Consulting
matt@bmconsult.co.nz
03 433 4531
Licensed: Design
Mason and Wales - Hamish Muir
Lodged by
Mason and Wales Architects (Architect)
architects@masonandwales.com
034771096
Applicant
Owner
moynihank.1@gmail.com
As written on the application form. Don't add applicants to email marketing lists: that needs their consent.
Timber cladding
  • Macrocarpa – heart Matai – heart
  • Weatherboards: Pinus Radiata
  • Larch – heart Macrocarpa – heart
  • Cedar H3.2
  • Cedar – heart H3.2
  • Cedar – heart Macrocarpa – heart
  • Macrocarpa – heart Kwila – heart
  • Macrocarpa Eucalyptus (Tasmanian Oak)
  • Species Western Red Cedar Grade PC1, Vertical Grain without crown cut faces
  • Coating: All cedar shall be factory coated on all surfaces (four sides) with the surface finish scheduled above ready for final coats on site. Any cut ends or exposed edges shall be
  • All cedar shall be factory coated on all surfaces (four sides) in selected colour ready for final coats on site. Any cut ends or exposed edges shall be immediately sealed.
  • Western Red Cedar panels in Band Sawn Face (BSF) finish, coated and finished as shown on the drawings.
  • f. Cedar weatherboards and facings g. Blackened steelwork
  • Schedule of Work All Interior Timber Work including, cedar ceilings, trims, wall linings Specification Preparation

Project Specifications (PDF, 2.0MB)

Lines of the assessment, plans or specification that mention timber cladding. Some describe what the neighbourhood rules allow rather than what is proposed.