RM261258 Resource The Hills Resort Limited Being Vetted
RM261181 Resource The Hills Resort Limited Being Vetted
RM260956 Resource Vary Condition 1 Of Rm250935 To Provide For Updated Management Plans, Including Escp, And Cemp, The Amended Plans Provide For Changes To Earthworks In Activity Areas, A1, A4, A5, A6 At 164 Mcdonnell Road, Queenstown The Hills Holdings Limited Decision Issued 19 Oct 2026
RM260948 Resource Controlled Activity Subdivision Creating 23 Freehold Lots In Activity Areas A4 And A5, A Balance Lot Over A6, Two Further Balance Lots, And Two Access/Services Lots; Establishment Of Lama L4 And L5. No Built Form Proposed At 164 Mcdonnell Road, Queenstown The Hills Resort Limited Waiting for Further Information
BC261261 Building Construction Of Workers Accommodation Building Building Consent Issued 12 Nov 2026
RM250967 Resource Construct An Extension To The Northern Elevation Of The Existing Clubhouse Building And Reconfigure The Existing Car Park At 164 Mcdonnell Road, Queenstown The Hills Holdings Limited Decision Issued 20 Oct 2026
RM250935 Resource It Is Proposed To Undertake 323,250M3 Of Earthworks Over An Area Of 554,510M2 (55.451 Hectares) For The Purpose Of Golf Course Redevelopment At 164 Mcdonnell Road, Queenstown The Hills Holdings Limited Decision Issued 20 Mar 2026
RM250837 Resource Construction Of 3 Units To Be Used For Visitor Accommodation And Associated Lama Strategy And Earthworks At 164 Mcdonnell Road, Queenstown The Hills Resort Limited Decision Issued 28 May 2026
RM250709 Resource Subdivision With Associated Earthworks And Land Use Consent For The Aa2 Lama At 164 Mcdonnell Road, Queenstown The Hills Resort Limited Decision Issued 17 Mar 2026
RM250588 Resource The Construction Of A Single-Level Building For Worker Accommodation, Including Associated Earthworks And Landscaping At 164 Mcdonnell Road, Queenstown The Hills Holdings Limited Decision Issued 17 Mar 2026
RM250483 Resource The Construction Of Three Single-Level Va Units, Including Associated Earthworks, Landscaping, And Subdivision To Create Three New Allotments At 164 Mcdonnell Road, Queenstown The Hills Resort Limited Decision Issued 29 Jan 2026
RM250428 Resource Establish A Water Reservoir And Relocate The Golf Course Access At 164 Mcdonnell Road, Queenstown The Hills Holdings Limited Decision Issued 9 Feb 2026
RM250376 Resource Establish A New Building With Associated Earthworks And Landscaping To Operate As A Golf Facility At 164 Mcdonnell Road, Arrowtown The Hills Holdings Limited Decision Issued 2 Oct 2025
MN250935 The Hills Holdings Limited - It Is Proposed To Undertake 323,250M3 Of Earthworks Over An Area Of 554,510M2 (55.451 Hectares) For The Purpose Of Golf Course Redevelopment At 164 Mcdonnell Road, Queenstown Awaiting Monitoring Inspection
MN250837 The Hills Resort Limited - Construction Of 3 Units To Be Used For Visitor Accommodation And Associated Lama Strategy And Earthworks At 164 Mcdonnell Road, Queenstown Awaiting Officer Review
MN250709 The Hills Resort Limited - Subdivision With Associated Earthworks And Land Use Consent For The Aa2 Lama At 164 Mcdonnell Road, Queenstown Awaiting Officer Review
MN250483 The Hills Resort Limited - The Construction Of Three Single-Level Va Units, Including Associated Earthworks, Landscaping, And Subdivision To Create Three New Allotments At 164 Mcdonnell Road, Queenstown Awaiting Officer Review
MN250428 The Hills Holdings Limited - Establish A Water Reservoir And Relocate The Golf Course Access At 164 Mcdonnell Road, Queenstown Awaiting Monitoring Inspection
MN250376 The Hills Holdings Limited - Establish A New Building With Associated Earthworks And Landscaping To Operate As A Golf Facility At 164 Mcdonnell Road, Arrowtown Awaiting Monitoring Inspection
EA250709 The Hills Resort Limited - Engineering Acceptance In Relation To Subdivision With Associated Earthworks And Land Use Consent For The Aa2 Lama At 164 Mcdonnell Road, Queenstown Being Vetted
EA250483 The Hills Resort Limited - Enginering Acceptance In Relation To The Construction Of Three Single-Level Va Units, Including Associated Earthworks, Landscaping, And Subdivision To Create Three New Allotments At 164 Mcdonnell Road, Queenstown Decision Issued
DR250483 The Hills Resort Limited - The Construction Of Three Single-Level Va Units, Including Associated Earthworks, Landscaping, And Subdivision To Create Three New Allotments At 164 Mcdonnell Road, Queenstown Development Contribution Notice Sent
DR250376 The Hills Holdings Limited - Establish A New Building With Associated Earthworks And Landscaping To Operate As A Golf Facility At 164 Mcdonnell Road, Arrowtown Development Contribution Not Required
DB251533 Stage 2 Of 2: Construction Of New Golf Training Facility - Building Enclosure From Above Foundation Slab. Development Contribution Notice Sent
DB251123 Construction Of 3 X Single Level Detached Dwellings For Visitor Accommodation - Future Lot 200 - 202 Development Contribution Not Required
BC251533 Building Stage 2 Of 2: Construction Of New Golf Training Facility - Building Enclosure From Above Foundation Slab. Building Consent Issued 26 Feb 2026
BC251192 Building Stage 1 Of 2 - Slab And In-Slab Services For Construction Of New Golf Training Facility Building Consent Issued 24 Nov 2025
BC251123 Building Construction Of 3 X Single Level Detached Dwellings For Visitor Accommodation - Future Lot 200 - 202 Building Consent Issued 25 Nov 2025

Consent numbers link to the consent's documents in QLDC eDocs, which needs an eDocs sign-in.

From the documents of RM260948 read 18 Nov 2026

Lodged by
Max Lichtenstein
max@brownandcompany.co.nz
03 409 2258
021 191 8834
Applicant
The Hills Resort Limited
gkenward@castlepartners.co.nz
09 303 9220
021493036
As written on the application form. Don't add applicants to email marketing lists: that needs their consent.
Timber cladding
Not mentioned in the documents read

From the documents of BC261261 read 18 Nov 2026

Value of work
$3m estimated on the application form, GST included
Designer
VIP Design
admin@vipdesign.co.nz
03 662 9492
Engineer
VIP Consulting Engineers Ltd
admin@vipconsulting.co.nz
03 662 9979
Builder
Cook Brothers Construction Southern lakes
maja.gibowicz@cookbrothers.co.nz
03 260 7260
Lodged by
Maja Gibowicz (Main Contractor - Design Manager)
maja.gibowicz@cookbrothers.co.nz
021 180 7633
Applicant
Owner
jo.oconnor@teari.com
022 395 5052
As written on the application form. Don't add applicants to email marketing lists: that needs their consent.
Timber cladding
Not mentioned in the documents read

From the documents of RM250709 read 19 Nov 2026

Lodged by
Max Lichtenstein - Brown & Company Planning Group
max@brownandcompany.co.nz
021 191 8834
Applicant
The Hills Resort Limited
gkenward@castlepartners.co.nz
09 303 9220
021 493 036
As written on the application form. Don't add applicants to email marketing lists: that needs their consent.
Timber cladding
Not mentioned in the documents read
Not read
no plans

From the documents of RM250588 read 19 Nov 2026

Lodged by
Max Lichtenstein - Brown & Company Planning Group
max@brownandcompany.co.nz
021 1918834
Applicant
The Hills Holdings Limited
gkenward@castlepartners.co.nz
09 303 9220
021 493 036
As written on the application form. Don't add applicants to email marketing lists: that needs their consent.
Timber cladding
Not mentioned in the documents read

From the documents of RM250483 read 19 Nov 2026

Lodged by
Max Lichtenstein - Brown & Company Planning Group
max@brownandcompany.co.nz
021 191 8834
Applicant
The Hills Resort Limited
gkenward@castlepartners.co.nz
09 303 9220
021 493 036
As written on the application form. Don't add applicants to email marketing lists: that needs their consent.
Timber cladding
  • The buildings will be comprised of cedar weatherboard in an oiled finish, plaster in a light grey finish, membrane roofing in a brown or dark grey finish, and aluminium joinery in a bronze finish. The light

A. AEE (PDF, 1.9MB)

Lines of the assessment, plans or specification that mention timber cladding. Some describe what the neighbourhood rules allow rather than what is proposed.

From the documents of RM250376 read 19 Nov 2026

Lodged by
Caleb Tien
caleb@brownandcompany.co.nz
034092258
0212066626
Applicant
The Hills Holdings Limited
gkenward@castlepartners.co.nz
09 303 9220
021 493 036
As written on the application form. Don't add applicants to email marketing lists: that needs their consent.
Timber cladding
  • to 6.8m in height (RL416.887). The external materials will consist of timber cladding, concrete, metal roof cladding and a tile clad chimney in a colour range of browns, greens and greys. The Light
  • VERTICAL CEDAR TIMBER BATTEN CLADDING

A. AEE (PDF, 1.6MB)Hi-res Plans (PDF, 37.5MB)

Lines of the assessment, plans or specification that mention timber cladding. Some describe what the neighbourhood rules allow rather than what is proposed.

From the documents of BC251533 read 19 Nov 2026

Value of work
$4.1m estimated on the application form, GST included
Designer
Erin Taylor of HYNDMAN TAYLOR ARCHITECTS
erin@hyndmantaylor.co.nz
021 247 1991
Engineer
Tim Niven of ENGCO STRUCTURAL ENGINEERING
tim@engco.co.nz
027 531 0741
Lodged by
Not named on the application form
Applicant
Owner
jo.oconnor@tearai.com
022 395 5052
As written on the application form. Don't add applicants to email marketing lists: that needs their consent.
Timber cladding
Not mentioned in the documents read

From the documents of BC251123 read 19 Nov 2026

Lodged by
Not named on the application form
Timber cladding
Not mentioned in the documents read
Not read
BC Application is not a Form 2